System 07
Production System
Plan, build and track every work order on the floor — with the schedule optimised as conditions change.
The service
A production plan made on Monday is wrong by Wednesday. The only question is whether the floor finds out from the system or from a shouted conversation across the shed.
We track the job from the order through the bill of materials, the routing, the work centre and the finished-goods receipt, so consumption, wastage and actual cost per unit are recorded as the work happens rather than reconstructed at month-end from memory.
AI takes the scheduling: resequencing work when a machine goes down or a material lands late, and flagging the equipment whose signature says it is about to stop the line. What you get back is a plan that survives contact with a real week.
What we deliver
Visibility from the order to the finished unit, and a true cost for each one — including the wastage nobody was counting.
- Bill of materials & routing
- Work order planning & scheduling
- Shop-floor tracking & job cards
- Material consumption & wastage
- Quality checkpoints & rejections
- Actual cost per unit & yield reporting
How we work
- 01
Model
We document your products, recipes, routings and work centres as they really run, including the substitutions made under pressure.
- 02
Configure
Work orders, quality gates and costing rules are built on that model and validated against completed jobs.
- 03
Instrument
The floor gets job cards it can actually use mid-shift, so data is captured at the machine rather than typed up later.
- 04
Optimise
With real throughput data in hand, AI scheduling and maintenance prediction are switched on and tuned to your constraints.
Magic Lantern owns the brief, the interface and the story around it. Cybromines engineers the system underneath. One table, one brief, no hand-off gap between the people who design it and the people who ship it.
About the partnership →Ready when you are